Czech Dutch English French German Spanish
Home | Search | About | Forum | Login

BOINC

FAQ Service (English)

 

BOINC Terminology: T.

FAQ: BOINC Terminology: T.
Title: BOINC Terminology: T.
Author: Jorden
Views: 10869
Category: 04. BOINC Terminology
Available in: English
Created: 25/01/2007 19:41:31
Last Modified: 02/03/2010 21:34:37

Contents:

Task

A piece of the Work Unit to be crunched on the participants computer. This is what you download from the project. See Work Unit.

Team

A group of people with the same interest who have come together to crunch for the same project.

To Completion

The (estimated) time remaining to the end of the result. Shown in BOINC Manager/Tasks.

Transitioner

The transitioner acts as a coordinator. It examines workunits for which a state change has occurred (e.g., a completed result has been reported). Depending on the situation, it may generates new results, flag the workunit as having a nonrecoverable error, or trigger validation or assimilation of the workunit.

Trickle

A between times status report of a result that is running.
Long running projects, such as ClimatePrediction.Net use trickles to send information about their model back to the servers. This so the people still have (some) information in case the result is never crunched to its full time (crashes, loss of interest by the user).

Turnaround Time

The time between your computer getting tasks and it crunching, uploading and reporting them.
 

Copyright © Neil Munday 2008